Commercial equipment electrical hookups, Twin Cities
A dedicated circuit, disconnect and final hookup sized to the nameplate and ready when equipment is set.
- We size circuits from the equipment nameplate
- We work with the vendor so power is ready on delivery day
- We check voltage, phase and operation for startup
- MN License #EA807704
- Bonded & insured
- Permits & inspections handled
- Free quotes
Get your free quote
Takes 30 seconds. No obligation.
We will call you to talk through the job and set up your free quote. Need us sooner? Call 612-991-4005.
Your email app should open with your request filled in. Press send, or call 612-991-4005.
Equipment Connections, start to finish
- Dedicated circuits and breakers
- Disconnect switches
- Control wiring
- Final hookup at the equipment
- Disconnect and reconnect for moves
- Voltage and phase checks

Three steps to a finished job
- Tell us what you need
Call 612-991-4005 or send the short form. Quotes are free.
- Get a written scope and price
We look at the job and put the scope and price in writing before any work starts.
- We do the work and get it inspected
We pull the permit, do the work, and the inspector signs off.
Common questions
Why do you need the equipment nameplate information?
Who is responsible for the equipment itself?
Does every piece of equipment need a disconnect?
Can you reuse an existing circuit for new equipment?
More about equipment connections
An equipment connection is the electrical work that brings power to a piece of fixed equipment: rooftop units, make-up air, compressors, conveyors, machine tools, water heaters, signage, vending, medical or lab equipment. It usually involves a dedicated circuit, correctly sized conductors and overcurrent protection, a means of disconnect, and a final connection to the equipment.
The nameplate on the equipment sets the requirements. Voltage, phase, full-load current and the maximum overcurrent protection all come from the manufacturer, and the installation has to respect them. Mistakes here lead to nuisance trips, damaged equipment or voided manufacturer support.
We handle connections for equipment that tenants, owners, vendors and mechanical or process contractors bring into Twin Cities buildings. Work is coordinated with the installer so the power is ready when the equipment is set, and the equipment can be started up without delays.
When you need it
- New machinery, HVAC equipment or appliances are being delivered and need power
- Existing equipment is being relocated within the building
- A replacement unit has different electrical requirements than the one it replaces
- Equipment is running on an extension cord or an undersized, shared circuit
- A rooftop unit, compressor or pump needs a disconnect that is missing or inaccessible
- You are installing signage, hand dryers, water heaters or other fixed equipment
- Equipment must be disconnected and reconnected for service, moving or replacement
What’s included, in detail
We size circuits and protection from the equipment's rated electrical data.
Breaker, wiring and raceway run from the panel to the equipment location.
Fused or non-fused disconnect switches installed where code and good practice require them.
Line-voltage and low-voltage control connections as the equipment requires.
Termination at the equipment, with flexible connections where the unit vibrates or moves.
Safe removal and reinstallation of equipment being moved or serviced.
Voltage, phase rotation and operation checks as required for startup.
Our process
- Collect the specs
We get the equipment data sheet, nameplate details and installer requirements.
- Verify the supply
We confirm the panel has capacity at the right voltage and phase, or plan the changes needed.
- Run and install
Circuit, disconnect and raceway are installed to suit the equipment location.
- Connect and verify
We make the final connection when the equipment is set, check supply and support startup.
More questions
Can you coordinate with the equipment vendor?
Guides
Often done together
Ready for your free equipment quote?
Call or send the short form. You get a written scope and price before any work starts.