MN Licensed Electrical Contractor #EA807704|Serving the Twin Cities metro

Commercial electrical demolition in the Twin Cities

We de-energize, verify and remove old electrical so your demo crew can work and neighbors keep power.

  • We trace circuits before we cut anything
  • We reroute circuits that serve neighboring spaces
  • We plan shutdowns with your GC and affected tenants
  • MN License #EA807704
  • Bonded & insured
  • Permits & inspections handled
  • Free quotes

Get your free quote

Takes 30 seconds. No obligation.

Licensed, bonded & insured · MN #EA807704

Prefer to talk? Call 612-991-4005

What you get

Electrical Demolition, start to finish

  • Circuit tracing and shutdown
  • Fixture, device and wiring removal
  • Live circuits rerouted
  • Conductors capped and terminated
  • Panel directories corrected
  • Area released to the next trade
Electrician terminating feeder conductors in an outdoor switchgear cabinet beside conduit runs on a commercial building
Feeder conductors and conduit at a commercial electrical service.
How it works

Three steps to a finished job

  1. Tell us what you need

    Call 612-991-4005 or send the short form. Quotes are free.

  2. Get a written scope and price

    We look at the job and put the scope and price in writing before any work starts.

  3. We do the work and get it inspected

    We pull the permit, do the work, and the inspector signs off.

FAQ

Common questions

Why can't the demolition crew just cut the wiring?
Unidentified circuits may still be live, and cutting them is a shock and fire hazard. They can also feed other spaces and cause outages. An electrician should verify and de-energize circuits before demolition proceeds.
Will tenants next door lose power?
Not if it can be avoided. We trace circuits specifically to find any that pass through the work area and serve other spaces, and we reroute them or schedule short, planned outages with the people affected.
Do you remove all the old wiring?
Only as far as the scope requires. Some abandoned wiring is left in place, and some is removed where it is accessible or in the way. The extent should be agreed in advance with the GC or owner.
Is a permit required for electrical demolition?
It depends on the extent of the work and the jurisdiction. When it is part of a larger permitted renovation, it is typically covered as part of that project. We confirm what applies.
More about electrical demolition

Electrical demolition is not just tearing things out. Before a ceiling comes down or a wall is removed, someone has to determine which circuits feed what, de-energize them, verify they are dead and make sure that circuits serving other tenants or areas stay on. That work belongs to a licensed electrician.

In commercial buildings, the existing wiring is often not documented. Circuits may be shared across spaces, abandoned wiring may remain in the ceiling and panel directories may be wrong. We trace circuits before we cut them, which helps prevent unplanned outages and surprises for your demolition crew.

We work ahead of general contractors and demolition crews on gut renovations, tenant turnovers and partial demolitions in the Twin Cities. We remove what the scope calls for, safely terminate or relocate what has to stay, and leave the space ready for new rough-in.

When you need it

  • A tenant space is being gutted for a new build-out and the old electrical must be removed
  • Walls and ceilings are coming down and the circuits inside them must be shut off first
  • A demolition contractor needs the area made safe before work starts
  • A section of a building is being removed while the remainder stays in operation
  • Abandoned wiring, old fixtures or unused equipment feeds are in the way of new work
  • Existing circuits that feed neighboring spaces pass through the area being demolished
  • Equipment is being removed and its feeders and disconnects have to be made safe

What’s included, in detail

Circuit tracing and identification

We determine what feeds the area and what else those circuits serve.

De-energizing and verification

Circuits are shut off, locked out as appropriate and tested before anyone cuts anything.

Fixture and device removal

Lighting, receptacles, switches and low-voltage devices removed per the scope.

Wiring and conduit removal

Abandoned and obsolete wiring taken out where accessible and called for.

Rerouting live circuits

Pass-through circuits that serve other areas are relocated so they stay in service.

Capping and termination

Remaining conductors terminated safely in approved enclosures.

Panel updates

Breakers labeled or removed and directories corrected after circuits are retired.

Our process

  1. Survey and trace

    We walk the area with the GC or owner and identify the circuits, panels and equipment affected.

  2. Plan the shutdown

    We schedule outages, notify affected parties and decide what must stay live.

  3. Isolate and remove

    We de-energize, verify, then remove devices, fixtures and wiring in the scope.

  4. Make safe and hand off

    Remaining circuits are terminated properly and the area is released to the next trade.

More questions

Do you handle hazardous materials like asbestos?
No. Older buildings may contain regulated materials, and abatement should be done by qualified specialists before electrical demolition begins. We will tell you if we see something that looks suspect and stop to let the proper parties evaluate it.

Guides

Ready for your free demolition quote?

Call or send the short form. You get a written scope and price before any work starts.

Call nowFree quote